SHP Želiezovce

Other Civil Engineering Works
Želiezovce, Slovakia

This waterworks on the Hron River is designed as a multipurpose structure. It performs water management, energy, environmental and social functions.

Basic information

Project Investor:

Hydroenergia s.r.o.

Project Designer:

VODOTIKA , a.s.

Project Duration:

07/2014 – 08/2016

Characteristics

This waterworks on the Hron River is designed as a multipurpose structure. It performs water management, energy, environmental and social functions.
The main function is the production of electricity in the SHP of 15,200,653 kWh per year.

Project in numbers

  • 3 920 kWMaximum power of the technological equipment
  • river km 35,750 až 39,525 water flow adjustment in this section
  • 2 horizontal Kaplan turbines SHP building
  • 2 x 1,4 MW Installed power
  • 13,5 GWh Expected production

Exceptionality of the structure

A multipurpose structure that performs water management, energy, environmental and social functions. Its main function is the production of electricity. A biocorridor is an integral part, namely the fish ladder in the dividing pillar between the fascine and the SHP.