Reconstruction of Hněvkovice Hydraulic Structure

Other Civil Engineering Works
Vltava River Km 210.390

The reconstruction of Hněvkovice hydraulic structure ensured it could cope with any flooding, even the worst flood in 10,000 years. Compared to the original state – around 1,750 m3/s – it is now able to safely handle a flow of up to 2,600 m3/s.

Basic information

Project Investor:

Povodí Vltavy s.p.

Project Designer:

AQUATIS, a.s.

Project Duration:

04/2020 – 12/2022

Reconstruction of Hněvkovice Hydraulic Structure
Obrázek

Characteristics

The spillway edges of two of the three safety spillways were lowered by 1.5 metres and their segmented closing elements were replaced. In order to be able to transfer flood flows, the lock was also modified – it was deepened, the upper gate was enlarged and the lower gate was replaced, including the control and management system.

Project in numbers

  • 19 m
    Maximum lock draught
  • 34 tonnes
    Weight of the upper gate
  • 70 tonnes
    Weight of the lower gate

Uniqueness of construction project

The structure for the protective sumps in front of the lock and the two segments of the dam were built from a boat. During the welding, specialised welders worked at depths of up to 17 m below the water surface with the constant attendance of divers. In these waters, visibility is normally only up to 30 centimetres.

Obrázek
Obrázek
Obrázek
Obrázek